久久亚洲国产成人影院-久久亚洲国产的中文-久久亚洲国产高清-久久亚洲国产精品-亚洲图片偷拍自拍-亚洲图色视频

Global EditionASIA 中文雙語Fran?ais
Business
Home / Business / Companies

China's first transmission phase shifter shows remarkable results in participating in power grid supply guarantee

chinadaily.com.cn | Updated: 2024-08-26 14:39
Share
Share - WeChat
[Photo provided to chinadaily.com.cn]

Recently, employees of State Grid Yangzhou Power Supply Company conducted inspections on the country's first 110 kV transmission phase shifter at 220 kV Ping'an Substation to ensure the reliable operation of the equipment. It is reported that thanks to the adjustment of power flow in the power grid by this transmission phase shifter, the maximum load of the No 2 main transformer of 220 kV Anyi Substation in Baoying, Yangzhou has dropped to 44,700 kilowatts, which is less than half of the historical highest level. This effectively alleviates the pressure on Anyi Substation to supply power to the load center of Baoying urban area and guarantees the high-quality and efficient power supply of Yangzhou power grid in summer.

The Baoying area of Yangzhou is rich in wind and solar resources, and the development of new energy has been rapid in recent years. As of the end of July, the installed capacity of new energy in the whole county has reached 1,492,200 kilowatts, and the annual power generation is 2.511 billion kilowatt-hours. However, 92 percent of the new energy in this area is concentrated in the eastern suburbs, and 55 percent of the power consumption load is distributed in the western central urban area. The reverse distribution of new energy generation and power consumption load makes the load of power facilities in the east and west of this area unbalanced, affecting the power supply safety and economic operation of the power grid.

For this reason, State Grid Jiangsu Electric Power Co Ltd selected the Baoying area as a pilot and took the lead in carrying out the construction of a scientific and technological demonstration project of transmission phase shifters. By installing a transmission phase shifter on the 110 kV connection line between Anyi Substation and Ping'an Substation, two 220 kV substations in the main urban area of Baoying, intelligent and efficient flow of electric energy is realized. Li Qun, vice-president of State Grid Jiangsu Electric Power Research Institute, said: "The transmission phase shifter is equivalent to adding an 'intelligent valve' to the power grid in Baoying, Yangzhou. By intelligently and accurately adjusting the power flow between Anyi Substation and Ping'an Substation, the load distribution between the two substations is balanced, and the power is allocated on demand."

Through the transmission phase shifter, up to 100,000 kilowatts of new energy power can be accurately transmitted to the urban center, equivalent to 15.9 percent of the total power consumption load in Baoying area. This greatly alleviates the power supply pressure at the load center; effectively reduces the frequency of overweight and overload of power facilities; and ensures the safe, stable and economic operation of the power grid.

It is reported that the application of this equipment fills the gap in the application of economic and compact power flow control technology in China. In the past year of operation, a total of 260 million kilowatt-hours of new energy power has been adjusted to the power consumption load center. The maximum load of the main transformers of the two connected substations has dropped by about 50 percent, and the average load difference between the main transformers has also dropped by about 40 percent. At the same time, the new energy consumption capacity of Ping'an Substation has been increased by about 100,000 kilowatts. 

1 2 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
主站蜘蛛池模板: 美女午夜色视频在线观看 | 国产免费一级高清淫曰本片 | 成人精品第一区二区三区 | 国产高清在线精品免费 | 午夜影院a级片 | 成年男女男精品免费视频网站 | 久久久国产精品网站 | 欧美日韩中文一区二区三区 | 美女在线网站免费的 | 日本成人一级片 | 欧美三级欧美成人高清www | 色一欲一性一乱一区二区三区 | 在线观看日本污污ww网站 | 亚洲天堂色视频 | 亚洲欧美一级久久精品 | 一级成人 | 99精品视频一区在线观看miya | 97免费视频观看 | 米奇精品一区二区三区在线观看 | 美女张开腿双腿让男人桶 | 国产女人成人精品视频 | 色久综合网 | 久久精品国产99久久 | 男女晚上爱爱的视频在线观看 | 无码免费一区二区三区免费播放 | 一级毛片美国aaj毛片 | 美女双腿打开让男人桶爽网站 | 日韩亚洲欧美一区 | 久久久久久久久久免费视频 | 一区二区三区免费在线观看 | 精品欧美一区二区在线观看欧美熟 | 亚洲欧美日韩另类在线 | 国产一区在线观看免费 | 手机看黄av免费网址 | 国产亚洲精品九九久在线观看 | 狼伊千合综网中文 | 精品日韩一区二区三区视频 | 欧美理论片在线观看一区二区 | 国内精品国语自产拍在线观看55 | 在线观看精品视频网站www | 精品久久中文字幕有码 |