www射-国产免费一级-欧美福利-亚洲成人福利-成人一区在线观看-亚州成人

  .contact us |.about us

Highlights ... ...
Search:
    Advertisement
Three phases of the Three Gorges Project
( 2003-07-01 17:31) (Chinadaily.com.cn)

Three Construction Phases

First phase, 1993-1997 (five years): Project preparation and first stage of construction, culminating in the damming of the Yangtze River in November 1997. The water of the Yangtze River was diverted through a man-made canal - the diversion channel, and the water level in the Three Gorges area rose by as much as 10 meters as a result.


Second phase, 1998-2003 (six years): The second stage culminates in the first batch of turbines beginning to generate hydropower and the permanent shiplock being put into operation. The reservoir is filled between June 1 and 15, 2003, when the water level in the Three Gorges have risen from the previous 66 meters above sea level to the current 135 meters.

TGP-Second Phase


Third phase
, 2004-2009 (six years): The project is to be completed in 2009, when all 26 generators will be operating. The water level will be raised to 156 meters in September 2006. At the completion of the project in 2009, the water level will reach 175 meters, referred to as the "normal pool level.
TGP Third Phase




   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 国产成人一区二区 | 国产精品亚洲片夜色在线 | 一级毛片免费不卡在线 | 成人做爰免费网站 | 亚洲另类激情综合偷自拍 | a毛片在线看片免费 | 永久在线 | 99成人精品| 免费在线看a | 国产大片线上免费观看 | 九九精品视频在线播放8 | 日本欧美一区二区三区高清 | 亚洲欧美在线观看播放 | ppypp日本欧美一区二区 | 日韩免费毛片全部不收费 | 久久久国产精品免费看 | 久久国产视频一区 | 经典香港a毛片免费观看 | 99毛片 | 国内一级特黄女人精品片 | 成年片美女福利视频在线 | 国产玖玖玖精品视频 | 国产精品久久久久久久久福利 | 亚洲天堂美女视频 | 精品久久久久久无码中文字幕 | 草草久久97超级碰碰碰免费 | 久久免费播放视频 | 精品欧美一区二区三区在线观看 | 亚洲最大网址 | 亚洲综合精品一区二区三区中文 | 一级高清毛片免费a级高清毛片 | 国产精品一区在线免费观看 | 国内自产拍自a免费毛片 | 国产香港特级一级毛片 | 美女图片131亚洲午夜 | 国产日韩久久久久69影院 | 另类专区国产在线视频 | 91视频最新网站 | 国产成人亚洲日本精品 | 免费看黄网址 | 欧美综合自拍亚洲综合百度 |