Dam of the Three Gorges Project
( 2003-07-03 15:01) (Chinadaily .com.cn)

1. Spillway
The Three Gorges Project is designed with a concrete gravity dam with a crest elevation of 185 meters and maximum height of 175 meters. The dam axis runs 2, 309. 47 meters long, which is even longer than the noted Grand Coulee Dam of US.

The 483-meter spillway, located in the middle of the main dam, has 23 bottom outlets dimensioned at 7?á9 meters. Each of its 22 surface sluice gates measures 8 meters wide. The maximum discharge capacity of the TGP is 116,000 cubic meters, the biggest in the world.

2. Left Powerhouse

Two powerhouses, flanking the spillway, accommodate altogether 26 sets of turbine-generators. As the world's biggest unit ever made, each has a generating capacity of 700MW. The 643.6-meter-long left powerhouse, 60 meters longer than the 584.2-meter-long right one, houses 14 sets of generators. With all these huge generators, the TGP is designed to generate electricity of 84.7 TW/h.

3.Right Powerhouse
On the right bank, enough room has been preserved for the future underground powerhouse of 6 turbine generator units with 4, 200 MW of installed capacity. The intakes of these units will be constructed simultaneously with the project.


4. Shiplift
The TGP shiplift is the world's largest. With a one-step vertical hoisting mechanism, the shiplock, equipped with a 120?á18?á3.5-meter container, is capable of carrying a 3,000-ton passenger liner or cargo boat at a time.

5.Temporary Shiplock
A temporary shiplock was built during the TGP construction period with an effective chamber at 240?á24?á4 meters.

6.Permanent Shiplock
The Three Gorges Project (TGP) permanent shiplock is designed in a two-way, five-step pattern with each lock chamber measuring 280?á34?á5 meters (L?áW?áD) and capable of passing a 10,000-ton barge fleet.

7.Dam Site
After a long but prudent study on 15 alternatives, the dam site for Three Gorges Project was finally determined at Sandouping, where a number of favorable factors gather at the small town 30 kilometers west to the Yichang city.
Sandoupin has a firm crystalline rock foundation, which is the most important geological condition a massive hydraulic project required of. The River valley here at Sandoupin is much broader than other site alternatives and hills on each sites lower.

A small islet, called Zhongbaodao by locals and cleaving the Yangtze River at its center, offers the most favorable pattern for the river diversion needs scheduled in the first phase of the TGP.

The bedrock of the dam site is sound and intact granite with 100 MPa of compressive strength. The faults and fissures in the bedrock are less developed and most of them are well cemented. The permeability of the rock mass and the weathered layers in the hills on both sides are also ideal.

No potentially devastating geological structures was detected within 15 kilometers of its vicinity. The regional seismic activities are small and not frequent.

   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 国产成人精品日本亚洲专区6 | 仑乱高清在线一级播放 | 久草最新网址 | 成人免费在线网站 | 精品国产日韩亚洲一区在线 | 性午夜 | 91久久国产精品视频 | 久久久精品一区 | 免费特黄| 日韩精品在线免费观看 | 日本一级高清片免费 | 91亚洲人成手机在线观看 | 亚洲国产精品区 | 午夜精品视频 | 欧美成人免费在线视频 | 黄色在线视屏 | 欧美成人ass| 日韩精品视频免费在线观看 | 国产精品久久久久网站 | 久久成人免费观看全部免费 | 国产精品色内内在线播放 | 国产成人精品一区二区免费 | 国产三级午夜理伦三级 | 中文字幕免费观看 | 国产一区欧美二区 | 久久毛片网站 | a毛片成人免费全部播放 | 韩国自拍偷自拍亚洲精品 | 免费一级成人毛片 | 永久免费观看午夜视频在线 | a级片免费观看视频 | 一级做a爰性色毛片 | 欧美三级aaa | 欧美一级va在线视频免费播放 | cao在线观看 | 欧美成人亚洲综合精品欧美激情 | 久草网首页 | 久久99精品久久久久久h | 男人女人做刺激视频免费 | 久久久久琪琪去精品色村长 | 欧美va免费大片 |