久久亚洲国产成人影院-久久亚洲国产的中文-久久亚洲国产高清-久久亚洲国产精品-亚洲图片偷拍自拍-亚洲图色视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

World's longest-span cable-stayed bridge undergoes load test before opening

Xinhua | Updated: 2025-06-19 10:09
Share
Share - WeChat
An aerial drone photo taken on May 24, 2025 shows the Changzhou-Taizhou Yangtze River Bridge under construction in East China's Jiangsu province. [Photo/Xinhua]

NANJING -- The final pre-opening safety checks have begun on the Changtai Yangtze River Bridge, the world's longest-span cable-stayed bridge, as engineers launched a high-stakes week-long load testing campaign on the hybrid rail-road structure early Tuesday in East China's Jiangsu province.

A series of scientifically rigorous load tests will thoroughly evaluate the actual performance of this world-class multifunctional bridge, which will provide crucial data for its subsequent safe operation, according to the Jiangsu provincial transport engineering construction bureau, the bridge's developer.

Spanning 10.03 kilometers, this engineering milestone integrates highways, intercity railways, and local roads across two levels. Its main channel features a record-setting 1,208-meter central span supported by cables, while its two auxiliary channel bridges each boast 388-meter steel arch spans, the longest worldwide for their type.

All load testing occurs exclusively at night to avoid temperature fluctuations affecting the steel-based structure, with over 800 sensors deployed to track micrometer-level structural shifts, according to the bureau.

During the first night's static test, 30 four-axle trucks weighing 1,200 tonnes were positioned like "six vehicles side-by-side on the upper highway deck and four on the lower rail-road deck," according to technicians, mimicking the weight of 800 passenger cars. The trucks remained stationary for eight hours to measure structural responses.

Seven days of trials cover 119 static and 111 dynamic scenarios across all bridge sections. The most intense static test will mobilize 110 trucks weighing 4,400 tonnes simultaneously on the main span, according to the bureau.

Dynamic examinations later this week include simulated traffic flows with braking and bumping sequences.

Scheduled for completion by late 2025, the bridge will slash travel time between Changzhou and Taizhou in Jiangsu province from 80 minutes to 20 minutes, boosting development for the Yangtze economic belt and integration of the Yangtze River delta region.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 久久久久久久久久久观看 | 中文字幕亚洲一区二区va在线 | 国产一级大片免费看 | 男女午夜性爽快免费视频不卡 | 欧美精品99 | 精品一精品国产一级毛片 | 日韩三级一区 | 亚洲天码中文字幕第一页 | 久久精品女人毛片国产 | 日本三级香港三级人妇 m | 久久黄色视屏 | 香蕉超级碰碰碰97视频蜜芽 | 成人中文字幕在线 | 女人张开腿让男人操 | 国产三级日本三级美三级 | 91探花福利精品国产自产在线 | 午夜一级片 | 国产最猛性xxxxxx69交 | 国产精品毛片久久久久久久 | 欧美日本一区二区三区 | 日本精品视频一视频高清 | 久久青草热 | cao美女视频网站在线观看 | 欧美一级别| 韩国精品一区二区三区四区五区 | 免费观看黄色毛片 | 亚洲精品久久久久久久久久久网站 | 亚洲欧美日韩在线播放 | 九草在线观看 | 国产精品亚洲精品久久成人 | 老外黑人欧美一级毛片 | 日韩精品国产一区 | 国产一级毛片免 | 中国a毛片 | 久久亚洲欧洲日产国码 | 国产午夜毛片v一区二区三区 | 久久久久免费精品视频 | 一区在线免费观看 | 国产精品路边足疗店按摩 | 一区二区三区四区在线视频 | 99热播 |