www射-国产免费一级-欧美福利-亚洲成人福利-成人一区在线观看-亚州成人

US EUROPE AFRICA ASIA 中文
Business / High-speed rail

How the new high-speed railway came on track

By Hu Yongqi and Xiang Mingchao in Zhengzhou and Yang Wanli in Beijing (China Daily) Updated: 2012-12-27 09:50

All HSR trains are taken to the workshop after they have covered 4,000 km or have been in service for 48 continuous hours. When the kilometers add up to 30,000 km, the trains are taken out of service for an intensive revamp.

"When a train arrives at our workshop, the maintenance engineers check it from top to bottom, including the wheels, the upper and lower electrical circuits and the high-voltage equipment. Each train is worked on by a team of 14, which has to complete all the checks and repairs in two hours and 35 minutes," said Ma Tao, deputy director of the workshop.

The maintenance engineers test 16 wheels in 30 minutes. If they encounter any damage, the engineers are only allowed to begin repairs after receiving permission from the quality-control inspectors. On the night of Dec 20, the engineers discovered that a link connecting the wheels was close to breaking point. A quality-control inspector took two minutes to assess the damage and then gave permission for the part to be replaced. He recorded the entire process on his camera and gave the old component a number for recycling.

"Usually, small parts are more easily broken. Wheels, which are 86 cm in diameter and can last for at least six months, are replaced when the diameter reduces to 79 cm, which takes about the same time," said Luo.

Engineer Cai Quan said he walks at least 15 km every night to fix trains on a predetermined line. "My wife complains that my shoes wear out much faster than my neighbors'," he said. "But that's my job."

More than 100 cameras have been installed in the workshop to monitor all the checkups and repair procedures. Engineers swipe their cards at the entrance which bears the slogan, "Zero tolerance to technical problems", and then all their moves in the workshop can be recorded. A giant screen in the monitoring center shows which engineer is working on which train. When the engineers finish their tasks, a video is prepared to aid investigations in the event of any subsequent accidents.

Drivers are the key

The railway system has upgraded equipment and new technologies. At Zhengzhou East Railway Station, a new system has been built to verify high-speed train tickets through personal ID cards. Even if the passenger has lost their ticket, the system will still allow them to ride the train.

On the fifth floor of a building next to Zhengzhou Railway Station, new drivers practice in a lifesize simulation of a driver's cabin as the rails unfold on an enormous white screen in front of them. Once initiated, the system can offer the drivers eight courses of action to follow and provides changing routes on the screen. A speed limit is set and the drivers learn to take the appropriate course of action when the light on the panel changes color.

Guo Xiansheng, a 33-year-old who now drives the route between Zhengzhou and Wuhan, capital of Hubei province, said the system has helped him follow standard operating procedures.

How the new high-speed railway came on track

An attendant hands a brochure to a passenger on the Beijing-Guangzhou high speed train which went into operation on Wednesday. Wang Zhongju / China News Service

Hot Topics

Editor's Picks
...
主站蜘蛛池模板: 亚洲午夜精品久久久久久抢 | 波多野结衣在线不卡 | 国产一级一片免费播放i | 成人免费视频一区二区三区 | 99精彩免费观看 | 久久亚洲天堂 | 亚洲bt欧美bt国产bt | 一级毛片免费观看视频 | 欧美超高清xoxoxoxo | 亚洲国产一成人久久精品 | 精品国产免费观看久久久 | 久久91亚洲精品久久91综合 | 国内自拍第100页 | 亚洲精品一区二区三区不卡 | 欧美特黄一级aa毛片 | 亚洲精品国产手机 | 国产看午夜精品理论片 | 国产乱子精品免费视观看片 | 国产免费福利体检区久久 | 久爱免费观看在线网站 | 国内精品久久久久影院网站 | 国产一区二区三区四区五区 | 日韩视频久久 | 黄色香蕉视频 | 久久国产精品久久久 | 国产高清国产专区国产精品 | 亚洲成人777 | 久久semm亚洲国产 | 91精品国产爱久久久久 | 欧美一级va在线视频免费播放 | 最新中文字幕一区二区乱码 | a黄色毛片| 三级欧美在线 | 99精品高清不卡在线观看 | 一区二区影视 | 国内自拍视频一区二区三区 | 中文字幕国产视频 | chinese宾馆自拍hd | 精品久久久久久影院免费 | 亚洲国产一成人久久精品 | 波多野结衣一级片 |